Grid Stability Challenges Posed by Increasing Use of Renewables - India Renewable Energy Consulting – Solar, Biomass, Wind, Cleantech
Select Page

The target of 175 GW of renewables by 2022 appears exciting for many of us, but it might not be so for the operators of the electricity grid.

Not because they do not like renewables, but because there are a number of challenges that an increasing mix of renewable energy sources pose to the grid stability.

Here is an excellent analysis piece on this topic by RN Nayak. Mr Nayak is someone who must be knowing something about this – after all, he was the former chairman of the Power Grid Corporation of India, the country’s almost monopoly electricity grid installer.

His piece in today’s Financial Express, titled “Establishing a vibrant electricity market” and subtitled Distribution utilities now have to deal with prosumers, storage entities and bidirectional flow, instead of just consumers is a sobering read for all us renewable energy enthusiasts. It deals with challenges posed by renewables to Network Development, Network O&M, Congestion and more…

He also offers some suggestions to ensure that we take good care of the grid while we invest heavily in renewables.

Read the entire news item from here

Also check out: Sustainability Edge – EAI Consulting to assist corporates design, evaluate and align sustainability strategies


Tags


electricity generation

grid congestion

power grid

power grid corporation

Copyright © 2024 EAI. All rights reserved.