Steps involved in setting up a hybrid system deserve extra attention because of its importance or uniqueness.

The key factors to be determined are

  • The load mix between PV and generator,
  • The size and type of generator, and
  • The battery size.

The sizing method assumes that a stand-alone PV system has already been considered–the load has been estimated and the solar radiation at the site is known. The primary decision is the load mix between generators. Selecting the mix is simplified by using the graph given in Figure below.

A hybrid power system has more than one type of generator-usually a gasoline or diesel-powered engine generator and a renewable energy source such as PV, wind, or hydropower system. For explanation, A W-engine hybrid is the only type considered in this report.

Here's more about EAI

climate tech image India's first climate tech consulting firm

climate tech image We work across entire climate tech spectrum

climate tech imageOur specialty focus areas include bio-energy, e-mobility, solar & green hydrogen

climate tech image Gateway 2 India from EAI helps international firms enter Indian climate tech market


Deep dive into our work

A hybrid system is most often used for larger applications such as village power; residential systems where generators already exist; and in applications like telecommunications where availability requirements are near 100 percent. Almost all PV generator hybrid systems include batteries for storage.  The most common configuration for a W-generator system is one in which the PV array and the generator each charge the batteries.

A block diagram is shown in the figure below. This configuration is intended to optimize the use of both power sources during normal operation. In many systems, the photovoltaic array is sized to supply power to the load during normal conditions. The generator is used only if solar radiation is low for several days in a row, or if load demand is unusually high. The generator is run for a short period of time near its optimum operating point, typically at 80 to 90 percent of rated power. This kind of operation reduces generator maintenance and fuel costs and prolongs the useful life of the generator.

PV-hybrid System Block Diagram




About Narasimhan Santhanam (Narsi)

Narsi, a Director at EAI, Co-founded one of India's first climate tech consulting firm in 2008.

Since then, he has assisted over 250 Indian and International firms, across many climate tech domain Solar, Bio-energy, Green hydrogen, E-Mobility, Green Chemicals.

Narsi works closely with senior and top management corporates and helps then devise strategy and go-to-market plans to benefit from the fast growing Indian Climate tech market.

narsi-img

Copyright © 2024 EAI. All rights reserved.